Identifying the characteristics of the supply chain processes in developing country : a manufacturing industry perspective

Part of : WSEAS transactions on business and economics ; Vol.11, 2014, pages 12-31

Issue:
Pages:
12-31
Author:
Abstract:
Lack of appropriate tools to model, evaluate and improve the supply chain is considered as one of the initiatives to major challenges to promote improvement among the firms in developing countries. The basic constituent of such models is the business processes. Firms in developing countries are lagging behind the recent trends of practices and researches. For continuous and sustainable improvement program that involves the entire supply chain including developing countries, it is necessary to have a well designed supply chain models that also consider the firms of the developing countries. The existing successful process-oriented models are highly dependent on the current business practices of the companies of the developed world. For both the new development and adapting of the successful models require the understanding of the characteristics of the existing supply chain processes and practices in the firms in a developing countries. The aim of this article is to identify the main characteristics of the current supply chain processes of the firms of the developing country based on the SCOR model business processes: Plan, Source, Make, Deliver and Return. The research methodology includes the literature review, questionnaire survey and semi-structured interview. The research data was collected from the Ethiopian manufacturing industries practices. Finally, the research findings reveal the characteristics of the supply chain processes. The identified processes characteristics could be used for the future model adaptation works.
Subject:
Subject (LC):
Keywords:
business process, SCOR model, developing countries, supply chain
Notes:
Περιέχει πίνακες, σχήματα και βιβλιογραφία
References (1):
  1. [1] Heriberto, Garcia Reyes, Ronald,Giachetti, (2010) "Using experts todevelop a supply chain maturity model inMexico", Supply Chain Management: AnInternational Journal, Vol. 15 Iss: 6,pp.415 – 424.[2] Han, S.-H. & Chu, C.-H. (2009)Developing a collaborative supply chainreference model for a regionalmanufacturing industry in China,International Journal of ElectronicCustomer Relationship Management,Volume 3, Number 1, 52 – 70.[3] Irfan, D., Xiaofei, X. and Sheng Chun, D.(2008), "A Scor Reference Model of theSupply Chain Management System in anEnterprise", The International ArabJournal of Information Technology, 5, 3,288-295.[4] Han, D., Kwon, I. G., Bae, M. And Sung,H. (2002) Supply chain integration indeveloping countries for foreign retailersin Korea: Wal_mart experience,Computer & Industrial Engineering, 43(2002) 111-121.[5] Trienekens J.H. 2011. Agricultural ValueChains in Developing Countries: AFramework for Analysis. InternationalFood and Agribusiness ManagementReview 14 (2): 51-82.[6] Humphrey, John, Upgrading in globalvalue chains Working Paper No. 28,Policy Integration Department WorldCommission on the Social Dimension ofGlobalization, International LabourOffice, 2004.[7] Fleury, A. and M.T. Fleury (2001).‘Alternatives for industrial upgrading inglobal value chains: The case of theplastics industry in Brazil’. In: IdsBulletin-Institute of Development Studies32 (3): pp. 116-126.[8] Davenport, T.H. and Short, J.E., 1990.The New Industrial EngineeringInformation Technology and BusinessProcess Redesign. Sloan ManagementReview, 31 (4), 11-27.[9] Fettke, P., Loos, P., Zwicker, J. (2006)Business process reference models –Survey and classification. In: LectureNotes in Computer Science, Vol. 3812,pp. 469–483, Springer.[10] Lockamy III, A. and McCormack, K.,2004. Linking SCOR planning practicesto supply chain performance, anexplorative study. International Journal ofOperations & Production Management,24 (12), 1192–1218.[11] Huang, S.H., Sheoran, S.K., and Keskar,H. (2005) “Computer-assisted supplychain configuration based on supply chainoperation reference (SCOR) model,”Computers and Industrial Engineering,Vol. 48, pp. 377-394.[12] Georgise, Fasika B.; Thoben, Klaus-D.;Seifert, Marcus. 2013. A Framework ofthe Forces Influencing the Adaptation ofthe SCOR Model to the Situation of theManufacturing Industry in DevelopingCountries, in. Dynamics in Logistics (3rdInternational Conference on Dynamics inLogistics – LDIC 2012 proceedings);2013 Springer-Verlag Berlin Heidelberg.[13] Chan, F.T.S. and Qi, H.J. (2003),“Feasibility of performance measurementsystem for supply chain: a process-basedapproach and measures”, IntegratedManufacturing Systems, Vol. 14 No. 3,pp. 179-90.[14] SCC. 2010 SCOR (Supply ChainOperation Reference) Model 10.0 bySupply Chain Council USA, 2010.[15] Di Martinelly, C., Riane, F., Guinet, A.(2009) A Porter-SCOR modelingapproach for the hospital supply chain.International Journal of Logistics Systemsand Management, 5(3-4): 436-455.[16] Xia, L.X.X. (2006), "Supply ChainModelling and Improvement in TelecomIndustry: A Case Study", in (Ed.),Industrial Informatics, 2006 IEEEInternational Conference on, 2006, 11591164.[17] Legnani, E., (2011), "Controlling andImproving the Provision of after-SalesServices", Doctoral Thesis (Doctor ofPhilosophy), Universtà Degli Studi diBergamo, Bergamo.[18] Paxton, J. and Tucker, B. (2010), "UsingSCOR as a Supply Chain ManagementFramework for Government AgencyContract Requirements", in Mattingly,B.R. & Profet, K. (Ed.), AerospaceConference, 2010 IEEE, 6-13 March2010 2010, 1-8.[19] Yong, T., Zhengying, C. and Huaqing, Q.(2010), "A Process-Based PerformanceAnalysis for Closed-Loop AgricultureSupply Chain", in Kellenberger, P. (Ed.),Intelligent System Design andEngineering Application (ISDEA), 2010International Conference on, 2010, 145149.[20] Fronia, P., Wriggers, F. S., Nyhuis, P.2008, A Framework for Supply ChainDesign, EngOpt 2008 - InternationalConference on Engineering Optimization,Rio de Janeiro, Brazil, 01 - 05 June 2008.[21] Johansson, M. and Persson, F. (2011),"Towards a Scor-Based Analysis Tool forConstruction Management and Logistics",in Persson, F. & Rudberg, M. (Ed.),PLANs Forsknings- ochtillämpningskonferens 2011 - Logistik ipraktisk tillämpning, 2011 NorrköpingSweden, PLAN, Stockholm, 125-139.[22] Persson, F., Bengtsson, J. and Ö., G.(2009), "Construction LogisticsImprovements Using the Scor Model –Tornet Case", in Vallespir, B. & Alix, T.(Ed.), Advances in ProductionManagement Systems, 2009 Bordeaux,France.[23] Persson, F. and Thunberg, M. (2012).Adapting the Scor Model to theConstruction Industry Settings. In: Töyli,J., Johansson, L., Lorentz, H., Ojala, L. &Laari, S., eds. NOFOMA 2012 - The 24thAnnual Nordic Logistics ResearchNetwork Conference, 7-8th of June 2012Turku, Finland.[24] Bean, W.L., Schmitz, P.M.U. andEngelbrecht, G.N., 2009: Adapting theSCOR Model to suit the military: A SouthAfrican Example. In Proceedings of the14th Annual Logistics Research NetworkConference: Volatile and Fragile SupplyChains.[25] Schmitz, P.M.U. (2007). The use ofsupply chains and supply chainmanagement to improve the efficiencyand effectiveness of GIS units, PhDthesis, University of Johannesburg, SouthAfrica.[26] Fayez, M. 2005. An automatedmethodology for a comprehensivedefinition of the supply chains usinggeneric ontological components,Dissertation, University of CentralFlorida.[27] James H. Barnard, 2006, A Multi-ViewFramework for Defining the ServiceSupply Chain using Object OrientedMethodology, PhD thesis, Department ofIndustrial Engineering and ManagementSystems in the College of Engineeringand Computer Science at the Universityof Central Florida Orlando, Florida.[28] Baltacioglu Tuncdan., Ada Erhan.,Kaplan, Melike D., Yurt, Oznur., &Kaplan, Y. Cem. (2007). A NewFramework for Service Supply Chains.The Service Industries Journal, 27(2),105-124.[29] Ellram, L., Tate, W. and Billington, C.(2004). Understanding and Managing theServices Supply Chain. Journal of SupplyChain Management, 40(4), 17(16).[30] Georgise, F.B, Thoben, K.-D., Seifert M.(2012) Adapting the SCOR Model to Suitthe Different Scenarios: A LiteratureReview & Research Agenda,International Journal of Business andManagement Vol. 7, No. 6; 1-17.